Matthew McMath |
Matthew McMath is a Registered Journeyman Welder, Inter-Provincial Red Seal, CWB Certified, is Certified in Pressure Welding and member of the Canadian Welding Association.
As an entrepreneur Matthew's success is due to his self-motivation and strong work ethic. He works well both independently and in team environments. Matthew has over 10 years experience welding in Oil & Gas, Mining, Hydro, Forestry, Construction, Pressure Welding, Carbon Steel, Stainless Steel and Aluminum, Structural, Maintenance & Repairs.
As an entrepreneur Matthew's success is due to his self-motivation and strong work ethic. He works well both independently and in team environments. Matthew has over 10 years experience welding in Oil & Gas, Mining, Hydro, Forestry, Construction, Pressure Welding, Carbon Steel, Stainless Steel and Aluminum, Structural, Maintenance & Repairs.
Education & Certification:
Welding
- AB Journeyman Welder
- Inter-provincial Red Seal (CANADA)
- Welder B (BC)
- Welder/Fitter (BC)
- AB Small bore Boiler Tube (MTBW)
- AB B-Pressure Welder
- PWP 7 (all position steel pressure pipe)
- PWP 10 (all position stainless pressure pipe)
- SMAW 4GF all-position CWB
- FCAW/MCAW 4GF all-position CWB
Safety
- Confined Space
- Fall Arrest Ticket
- Level 1 Occupational First Aid
- Leavitt Aerial Work Platform Ticket
- H2S ALIVE
- CSTS & PST
- OSSA Regional
- Level A CPR
- WHMIS\CSTS
Experience
Protech Industrial Movers – Delta BC – Oct 2015 – Ongoing
Welding, gouging, seismic controls, millwright, rigging and moving equipment.
Renewal Constructors – Vancouver BC – Oct 2015 – Nov 2015
Deck ceiling repairs and upgrades.
Alumtek Industries – Aldergrove BC – Apr 2014 – Sept 2014 / Mar 2015 – Jun 2015
FCAW design, fabricate and weld 3”-6'' pipe for generator sets.
Site Energy – Apr 2013 – Feb 2014 / Jan 2015 – Mar 2015
Cenovus Foster Creek Phase F
Cenovus Foster Creek Phase 2
SMAW, FCAW: root, hotpass, fill and cap 36”, 30”, 12”, 8”, 6”, 4” mainline, lateral and valve stations.
Major Welding – Fraser Valley, BC – Jun 2014 – Aug 2014
FCAW fit and weld 1” - 12” pipe.
URS Flint Pipeline – Fort McMurray, AB - Jun 2012 – Mar 2013
Surmont 2 SAGD Project
SMAW downhand root & hotpass, FCAW uphand fill and cap of Steam and ERW pipeline.
Tradesmen Enterprises (GP Inc.) – Grand Prairie, AB - Mar 2012 – Jun 2012
AltaGas Gordondale Gas Plant
SMAW 1\2” - 24” pipe to ASME B31.1 and B31.3
CH2M Hill Construction – Fort Nelson, BC - Jun 2011 – Feb 2012
Fort Nelson North Process Facility- Spectra Gas Plant
SMAW & GTAW Weld 1\2”-24” pipe to ASME B31.3 (100% xray)
Gisborne Group - Princeton, BC - Apr 2011 – May 2011
Copper Mountain Mine
Weld process pipe for new copper mine.
PSI Contract Services – Abbotsford, BC - Feb 2011 – Apr 2011
Tumbler Ridge, Wolverine Mine Maintenance: maintenance and repair on heavy equipment and attachments.
Norweld Mechanical Ltd. – Prince George, BC – Sept 2010 – Feb 2011
Pulp Mill and Coal Process Plant shutdowns in Chetwynd and Tumbler Ridge, BC
2” - 16” Sch. 80 pipe. Cut, cope, fit and weld process pipe and piping supports.
Finning (Cananda) – Red Deer, AB – Jul 2010
Gouge and Weld repairs on D10 track frames.
Central Composting Ltd. – Abbotsford, BC – Jun 2010
Fit and weld 4” sch 40 mild steel steam pipe for mushroom facility.
Peter Kiewit:
Cimco Refrigeration – Langley, BC – Oct 2009 – Dec 2009
EV Logistics, Gloucester Estates
Structural welding on new EV Logistics refrigeration system
Safeguard Fence – Langley, BC – Oct 2009 – Nov 2009
Fabricate and weld 4000ft galv. steel fence.
Boteck Welding – Fraser Valley, BC – Oct 2008 – Mar 2011
Core Boss: Fabricate and weld beams for mezzanine.
Suncor Firebag site: Fabricate and weld Electrical building catwalks and stairs
Alumtek: Fabricate and weld generator enclosures
Welding, gouging, seismic controls, millwright, rigging and moving equipment.
Renewal Constructors – Vancouver BC – Oct 2015 – Nov 2015
Deck ceiling repairs and upgrades.
Alumtek Industries – Aldergrove BC – Apr 2014 – Sept 2014 / Mar 2015 – Jun 2015
FCAW design, fabricate and weld 3”-6'' pipe for generator sets.
Site Energy – Apr 2013 – Feb 2014 / Jan 2015 – Mar 2015
Cenovus Foster Creek Phase F
Cenovus Foster Creek Phase 2
SMAW, FCAW: root, hotpass, fill and cap 36”, 30”, 12”, 8”, 6”, 4” mainline, lateral and valve stations.
Major Welding – Fraser Valley, BC – Jun 2014 – Aug 2014
FCAW fit and weld 1” - 12” pipe.
URS Flint Pipeline – Fort McMurray, AB - Jun 2012 – Mar 2013
Surmont 2 SAGD Project
SMAW downhand root & hotpass, FCAW uphand fill and cap of Steam and ERW pipeline.
Tradesmen Enterprises (GP Inc.) – Grand Prairie, AB - Mar 2012 – Jun 2012
AltaGas Gordondale Gas Plant
SMAW 1\2” - 24” pipe to ASME B31.1 and B31.3
CH2M Hill Construction – Fort Nelson, BC - Jun 2011 – Feb 2012
Fort Nelson North Process Facility- Spectra Gas Plant
SMAW & GTAW Weld 1\2”-24” pipe to ASME B31.3 (100% xray)
Gisborne Group - Princeton, BC - Apr 2011 – May 2011
Copper Mountain Mine
Weld process pipe for new copper mine.
PSI Contract Services – Abbotsford, BC - Feb 2011 – Apr 2011
Tumbler Ridge, Wolverine Mine Maintenance: maintenance and repair on heavy equipment and attachments.
Norweld Mechanical Ltd. – Prince George, BC – Sept 2010 – Feb 2011
Pulp Mill and Coal Process Plant shutdowns in Chetwynd and Tumbler Ridge, BC
2” - 16” Sch. 80 pipe. Cut, cope, fit and weld process pipe and piping supports.
Finning (Cananda) – Red Deer, AB – Jul 2010
Gouge and Weld repairs on D10 track frames.
Central Composting Ltd. – Abbotsford, BC – Jun 2010
Fit and weld 4” sch 40 mild steel steam pipe for mushroom facility.
Peter Kiewit:
- Anthony Henday Project – Edmonton, AB – July 2010 – August 2010 – Weld bearing pads for new bridge construction on Anthony Henday overpass.
- Montrose Powerhouse (mechanical) – April 2010 – May 2010
- East Toba Powerhouse (mechanical) – January 2010 – March 2010 – Weld 4' - 5' diameter heavy wall pipe for TIV valve. Keeping within 0.1mm tolerance distortion.
- Toba\Montrose Hydro Electrical Project (penstock) – June 2009 – October 2009 – Weld 8' and 9' diameter water pipe of various wall thickness, for water transit line on a penstock Run of the River hydro-electric project.
- Voyagouer Project – Fort McMurray, AB – 2008 – General foreman; organize, plan work scope, order all consumables and supplies.
- Sea to Sky Hwy, Seg 3 – November 2008 – December 2008 – Stawamus River Bridge Ph II. Fit and weld 24” diameter pile and false-work.
- Pitt River Bridge – 2007 – 2009 – Welding Foreman, building load test (largest in world at the time) and access tressle.
Cimco Refrigeration – Langley, BC – Oct 2009 – Dec 2009
EV Logistics, Gloucester Estates
Structural welding on new EV Logistics refrigeration system
Safeguard Fence – Langley, BC – Oct 2009 – Nov 2009
Fabricate and weld 4000ft galv. steel fence.
Boteck Welding – Fraser Valley, BC – Oct 2008 – Mar 2011
Core Boss: Fabricate and weld beams for mezzanine.
Suncor Firebag site: Fabricate and weld Electrical building catwalks and stairs
Alumtek: Fabricate and weld generator enclosures